About Mumbai Trans Harbour Link Project!
The Mumbai Trans Harbor Link (MTHL) is almost finished, and it will likely open to the public in time for the holiday season of 2023. The MTHL is almost 90% finished, and transfer loops and ramps currently link the main bridge to other highways. Eight ramps make up the Sewri Interchange, including two that link Hajibandar Road, four that connect Mumbai and Navi Mumbai to the Eastern Expressway, and two that do the same for the Sewri-Worli Connector. Six ramps at Shivajinagar Interchange lead to the coastal road that CIDCO is proposing. Navi Mumbai, JNPT, and MTHL would be connected to SH-54 by four ramps with 2+2 lanes each.… Read more